Spring Meadow Condominium
The Spring Meadow Condominium requested resurfacing of their main road and parking lot. Resurfacing of the main road required 2 inches of existing asphalt be removed and replaced with 2 inches of new asphalt. Photos 1-4 are from this project. The second project required the complete removal of old asphalt and installation of 3 inches […]
West Point Military Academy
West Point Military Academy wanted three decorative imprinted projects. The first was a walkway from the street, across the main parking lot and going to their Visitors Center. The asphalt walkway needed to look like actual tiles that were already in place at the front entrance to the building. Photos 1-6 are from this project. […]