Completed

Description

The Spring Meadow Condominium requested resurfacing of their main road and parking lot. Resurfacing of the main road required 2 inches of existing asphalt be removed and replaced with 2 inches of new asphalt. Photos 1-4 are from this project.

The second project required the complete removal of old asphalt and installation of 3 inches of new asphalt. Photos 5- 7 are from this project.

  • Pave road and parking lot